Skip to main content

Heston Primary School outdoor seating area prior to renovation

PGSD Limited was asked to help to revitalise an outdoor area at Heston Primary School.

  • We carefully lifted and removed the astro turf.
  • We broke out the concrete and dug out the timber posts.
  • PGSD supplied and installed new timber posts and cement in situ.
  • We supplied and installed timber rails behind the posts to secure the posts together.
  • Then we supplied and spread MOT base to the area and consolidated.
  • The PGSD team supplied and spread sharp sand to the area and consolidated.
  • We relaid the existing astro turf with the cuts already in the turf.
  • All fixtures and fixing were supplied for this project.