PGSD Limited was asked to help with a project at Edward Pauling Primary School in Feltham, in the London Borough of Hounslow. The School is a two-form entry school for boys and girls between the ages of three and eleven.

The project requirements were:
– Dig out pathways to a depth of 100mm.
– Supply and install timber edging to the paths.
– Supply and lay gravel to the paths as a finished level.
– Supply and build 3 x 8 x 1 metre raised sleeper beds screwed together with timber locks.
– The above to be cemented into the ground with posts.
– Remove the old liner from the pond.
– Reshape the pond to an area of 6m x 5m and infill the remainder of the pond.
– Supply and lay 4 tons of soft sand to line the pond.
– Supply and install underlay and pond liner.
– Supply and fill raised planters.

The photographs show the raised sleeper beds and pond (work in progress).