PGSD Limited was asked to quote for circa 300 metres of artificial lawn by Heston Primary School.
Having been awarded the project, we dug 65mm below the concrete edging and laid 50mm of type 1 base which was compacted down with a roller.
Our team then added 15mm of sharp sand compacted.
We then laid the Ascot lawn to the prepared areas.